Back

This high profile project entailed installation of 5.3 miles of 16" DI Water Main along RT 195 and an additional 3000' of 12" DI Water Main on RT 44 in Mansfield. Project included installation of a Pressure Reducing Vault, Pressure Relief Vault and bridge crossings (2) of the Willimantic River and Railroad Lines.